    Screen wall within an existing building structure

    Release time:2026-03-31 17:02:31      Click count:109

    Case Study: Integrated LED Screen Wall 

    – Tamworth Imperial Hotel Refurbishment


    As part of the Tamworth Imperial Hotel refurbishment in NSW, Taskwell was engaged as a Tier 3 supplier to deliver an integrated LED screen wall solution within a complex interior upgrade environment. The project involved the construction of a 2.4m high × 9m wide LED display partition wall, requiring close coordination with the hotel owner and the head contractor throughout all project stages.


    From the design phase, Taskwell worked collaboratively with the project team to ensure the LED wall could be fully integrated into the existing building structure. This required careful consideration of structural support systems, as well as coordination with electrical, hydraulic, and mechanical services already present within the wall cavity. Detailed shop drawings and coordination layouts were developed to avoid clashes with existing cable routing, piping systems, and building constraints.


    During the procurement and manufacturing phase, the wall’s structural framing and LED display modules were designed as modular prefabricated components. These semi-finished units were manufactured off-site under controlled conditions, ensuring quality consistency and reducing on-site installation risks. The modular approach also allowed efficient logistics, with all components transported to Tamworth for final assembly.



    At the installation stage, the system was assembled and commissioned on-site by licensed Australian electricians, ensuring full compliance with local standards and safety regulations. The integration of power systems, control units, and display modules was executed in a coordinated sequence to maintain both safety and installation efficiency within an active refurbishment environment.



    Following installation, Taskwell continues to support the project through maintenance and technical service, ensuring long-term system reliability and performance.


    LED module in installation.png

    <by Chatgpt AI image>


    This project demonstrates Taskwell’s capability to deliver engineering-integrated, modular LED solutions, effectively bridging design, manufacturing, and on-site execution while working seamlessly within a Tier 1 and Tier 2 delivery framework.